Fabrication converts the controlled detailing package into physical components.
A typical production route may include:
- Receiving and identifying materials
- Cutting, drilling and forming
- Fit-up and assembly
- Welding or other connection preparation
- Trial assembly where specified
- Dimensional inspection
- Surface preparation and protective treatment
- Component marking, packing and release
Quality control should be planned before production starts. Waiting until fabrication is complete can make defects more difficult and expensive to correct.
Depending on the project requirements, inspection may address:
- Material identity and certification
- Member dimensions and hole positions
- Fabrication tolerances
- Welding procedures and personnel qualifications
- Weld inspection
- Bolt assemblies and prepared surfaces
- Surface preparation
- Coating thickness or galvanizing
- Component identification
- Inspection and test records
Design codes do not necessarily contain all requirements for manufacturing and installation. Separate execution standards may apply. For example, BS EN 1090-2:2018+A1:2024 specifies technical requirements for the execution of steel structures within its field of application.
The project specification must identify the applicable standard, execution requirements, acceptance criteria and any supplementary provisions. A standard reference alone does not resolve every project-specific requirement.
For more detail on factory-based production, see Prefabrication in Steel Buildings: Benefits, Process, and Quality Control.